RAFI Electromechanical

Types of Electromechanical

Change category view
Results: 3,875
Select Image Part # Mfr. Description Datasheet Availability Pricing (INR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
RAFI Switch Actuators RAFIX 30 FS Plus Selector switch 2x40 Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Pushbutton Switches Pushbutton illum flush lens
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Actuators Round, metal, Illum Raised lens MOM.
Non-Stocked Lead-Time 12 Weeks
Min.: 50
Mult.: 10

RAFI Keylock Switches RAFIX 22 QR Round Collar
Non-Stocked Lead-Time 9 Weeks
Min.: 1
Mult.: 1

RAFI LED Mounting Hardware FITTING Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Tactile Switches 1NO 2.9N 3V 2 LEDs
Non-Stocked Lead-Time 12 Weeks
Min.: 25
Mult.: 25

RAFI Switch Fixings 21.5MM RECT LENS-YELLOW
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings LENS PUSHBUTTON CLEAR SQUARE
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings Rnd Lens transp colorless for LED
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
RAFI Switch Fixings Lens Transparent Rect Flush Red
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Contact Blocks / Switch Kits RAFIX 22 QR LED Unit 24V Red
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Contact Blocks / Switch Kits RAFIX 22 QR LED 24V Blue
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Bezels / Switch Caps RK 90 II Sealing frame square Non-Stocked Lead-Time 12 Weeks
Min.: 250
Mult.: 10

RAFI Switch Bezels / Switch Caps RK 90 II Sealing frame none Non-Stocked Lead-Time 12 Weeks
Min.: 250
Mult.: 10

RAFI LED Mounting Hardware RAFIX FS LED clip 12V Green
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings Spacerbushing round, L 4,00 mm, gn Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings Spacerbushing triangular, L 3,75 mm, yl Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Bezels / Switch Caps RACON 8/12 PLUNGER D 19.0 L 4.80 mm Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings RK 90 Lens 14mm 1-module transp. Red Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings RK 90 Lens 14mm 11/4 mod transp. Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings RK 90 Lens 14mm 2-module transp. Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings LUMOTAST 75 IP65 Lens round colorless
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings LUMOTAST 75 IP65 Lens sqr transp Grn
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings LUMOTAST 75 IP65 Legend insert rect.
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

RAFI Switch Fixings LABEL
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1