All Results for "2830" (1,830)

Select a category below to see filtering options and narrow down your search.
Sort Order:
Categories sorted by Result Count.
Sort Order:
Categories sorted by Result Count.
Select Image Part # Mfr. Description Datasheet Availability Pricing (INR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
ebm-papst ebm-papst EC Diagonal Module with Housing, 254x254x119mm, 115VAC, 610m3/h, IP20
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

ebm-papst ebm-papst EC Diagonal Module with Housing, 290x290x123mm, 230VAC, 535m3/h, IP20
Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Samtec Ribbon Cables / IDC Cables .050 Low Profile Tiger Eye IDC Ribbon Cable Assembly
Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Samtec Ribbon Cables / IDC Cables IDC Socket Cable Assemblies
Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

ebm-papst ebm-papst EC Centrifugal Module, Backward Curved, 270x270x131mm, 230VAC, 790m3/h, IP54
Non-Stocked Lead-Time 12 Weeks
Min.: 120
Mult.: 1

ebm-papst ebm-papst EC Centrifugal Module, Backward Curved, 300x300x116mm, 230VAC, 835m3/h, IP54
Non-Stocked Lead-Time 12 Weeks
Min.: 120
Mult.: 1

ebm-papst ebm-papst EC Centrifugal Fan, Backward Curved, 250x250x99mm, 230VAC, 835m3/h, IP54
Non-Stocked Lead-Time 12 Weeks
Min.: 120
Mult.: 1

Renesas Electronics Clock Buffer 1-to-2 Differential to LVCMOS Fanout Buf
Min.: 1
Mult.: 1
: 3,000

Silex Technology Multiprotocol Modules Wi-Fi+BLE Mod SM w/Ant uFl connector
Non-Stocked Lead-Time 30 Weeks
Min.: 500
Mult.: 500
: 500

Epson Timing Standard Clock Oscillators SG-8018CA 7.372830M-TJHSA0: MHZ OSC 1.8V 3.3V +/-50PPM -40 105C ST 1K TR Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1
: 1,000
LAPP Multi-Conductor Cables OLFLEX FD 891 P 7G1,5
Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 100
Amphenol LTW Circular Push Pull Connectors FLOS, B Series C Size, Metal, 1.5A, 16 pins, Male Connector, Male Contact, Straight, Push Pull, Solder, Field Installable, F5.3 - F6.2mm, IP50
Min.: 1
Mult.: 1

Amphenol FCI Standard Card Edge Connectors HPCE VR 8HP2LP24S-10116283-004LF Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Astrodyne TDI Power Line Filters 480V, 3-Phase WYE Dual Stage Power Line Filter
Non-Stocked Lead-Time 10 Weeks
Min.: 3
Mult.: 3

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
: 4,000

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 40,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 80-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 1,20,000
Mult.: 4,000
: 4,000

Lumileds White LEDs White 3000 K 90-CRI, LUXEON 2835 Line
Non-Stocked Lead-Time 5 Weeks
Min.: 1,20,000
Mult.: 4,000
: 4,000